Procurement wants comparable quotes, a certification section a reviewer will accept, and a paper trail that survives an audit. These guides cover writing an RFQ vendors can actually quote against, why a survey should precede any quote, naming certifications correctly in a government tender, and what a servicing record adds to the compliance picture.

Start here

A tender document that has to survive review, not just get submitted

Procurement teams writing an air purification requirement into an RFQ or tender face a specific problem: leave the specification loose and every vendor quotes something different that can't be compared side by side; write it too narrow and you've written one vendor's product into the document. The starting point is the same arithmetic a facilities manager uses for a single room, applied across every room on the schedule rather than one blanket line item, and captured precisely enough that a reviewer — or an auditor eighteen months later — can trace the number back to a room. See writing an RFQ vendors can actually quote against for the fields worth including before the document goes out.

Why the survey comes before the quote, not after

Required CADR (m³/h) equals floor area (m²) multiplied by ceiling height (m) multiplied by target air changes per hour. A 30 m² consultation room at 2.7 m targeting the US CDC's benchmark of 5 clean-air changes per hour needs 30 × 2.7 × 5 = 405 m³/h; a 60 m² procedure suite at the same ceiling height and a higher 6 ACH target needs 60 × 2.7 × 6 = 972 m³/h. Those figures only hold if the floor area and ceiling height on the drawing match what's on site — and drawings routinely disagree with as-built rooms once partitions, false ceilings and furniture are accounted for. That is why a quote built from a floor plan is an estimate rather than a specification: why procurement should request a survey before accepting any quote sets out what a room-by-room measurement adds that a plan can't. Once every room has a measured figure, vendor responses become comparable on the same basis, which is the difference a reviewer is actually looking for — see comparing air purifier vendor quotes fairly.

Naming certifications the way a reviewer will accept

A certification section that a tender reviewer will pass reads as scope and holder, not adjectives. A model paragraph: "The proposed units carry an FDA Class 2 medical device listing held by the manufacturer, H13 HEPA filtration to specification, CE and RoHS conformity, and ISO 9001 and ISO 14001 management system certification held by the manufacturer. Supporting documentation is available on request." That sentence names the classification and states who holds it, and stops there — it doesn't say "FDA approved," "compliant" or "medically certified," because none of those phrases match what the listing actually is, and a careful reviewer will flag the mismatch rather than reward the confidence. Government tenders: naming certifications correctly and what certifications belong in a hospital facilities tender go through this line by line for those settings, and what to put in a dental clinic tender document covers where SS 554 fits alongside it.

Equipment on the schedule, not just a product name

The RFQ or tender schedule should list a unit per room band rather than a single SKU for the building: the Fillo Plus for rooms to about 30 m² (CADR 300 m³/h), the Classic 400S for 31–54 m² (CADR 480), and the Pro 800S for 56–96 m² (CADR 800), each with its dB rating stated since a procedure room and a waiting room have different noise tolerances. Attaching a reference sheet from technology or products gives vendors a fixed baseline to quote against rather than leaving filtration stage and dB level open to interpretation.

Purchase, rental and the paper trail after award

Units are quoted for purchase or as a serviced rental — filters, parts, preventive visits and two-way delivery included — after the survey, not before; there is no public price list, because the configuration depends on the room count and ACH target on that specific schedule. Once equipment is installed, the audit trail doesn't stop at the certification pack: servicing records demonstrate ongoing upkeep between award and the next review cycle, and what each visit should note is covered in why servicing records are part of your compliance picture. Keep the certificates, the survey report and the servicing log together — tender audit documentation for air purifiers sets out what a reviewer expects to find on file and realistic timelines for getting a compliance certificate issued. A fit-out specified for one headcount is also worth revisiting as the office changes; reviewing your fit-out air quality decisions a year later covers what to check against current certifications.

What we will not put in a submission

We will not write "FDA approved," "MOH approved" or "compliant" into a certification section, because none of those is what the listing actually says. We will not cite an infection or sick-day reduction figure, because we don't have one sourced to your building, and a chamber result — over 99.99% of tested organisms eliminated within 60 minutes under chamber-test conditions — describes a chamber, not an occupied office. We also will not invent a reference price or a past client name to fill a template field. Where a claim needs backing, point the reviewer to how we verify our claims rather than restate it more strongly in the document.

Turning the schedule into a measured spec

Before the RFQ goes out — or before a quote already in hand gets signed off — the Clinic Air Report turns the floor plan into room-by-room numbers: S$150 per site visit, a minimum of two rooms, every room measured on site, and a report back by email within two working days. It carries a sized-right guarantee: if a specified unit doesn't reach the report's air-change figure once installed, we upgrade or add a unit at no extra cost, which gives procurement something concrete to hold a vendor to. From there, compare rental against purchase, or use the sizing calculator to sense-check numbers before the visit is booked. Contact us to schedule one.

All guides in this topic

Common questions

What should a certification section say?

Name the exact classification and who holds it: for AIRE, an FDA Class 2 medical device listing held by the manufacturer, H13 HEPA specification, CE and RoHS conformity, ISO 9001 and 14001 management systems. Never 'FDA approved'.

Why survey before accepting a quote?

A quote from a floor plan is an estimate. A room-by-room survey (the Clinic Air Report, S$150 per visit) turns it into a specification a supplier can be held to.

Have your rooms sized, room by room

The Clinic Air Report is S$150 per site visit: we measure every room, calculate the clean-air delivery it needs and specify the unit that reaches it, with the arithmetic shown and the sizing guaranteed.